W Doha (Marriott)
Implementing aesthetically pleasing perimeter security solutions at a logistically challenging location.
Delivering a solution that could blend in with the environment and be installed on a suspended slab.
Bespoke engineered bollard systems installed through the slab structure, with built-in automatic vehicle access control.
Input this code:
We will only use these details to respond to this message. Please tick the box if you would like to opt-in to marketing emails from ATG Access.
See our privacy policy.
Please leave this field empty.
W Hotel is located in the Heart of Doha, a landmark development project in Doha, Qatar, to rejuvenate the heart of the city, whilst preserving some of its most historic areas.
As one of the first 5-star lifestyle hotels in Qatar, W Doha aims to “bring all the energy of New York City” to the vibrant district. A luxurious destination in itself, W Doha is close to some of Doha’s premier attractions, including Corniche Promenade and the City Center Shopping Mall.
The W Hotel in Doha was identified by our local partner ACEC as an asset requiring upgraded perimeter security.
Automatic bollard systems were required to be installed above an underground car park. Planning permission was granted following the submission of an engineering solution specially designed by ATG Access.
As a hotel, it was important for the bollards to be aesthetically pleasing as well as secure. Representatives from ATG Access visited the site on several occasions to provide advice and consultation on how to achieve this.
The underground structures and beneath the site also posed limitations on installation depth, meaning that traditional bollards would not be suitable for the project.
ATG Access designed specially engineered outer casings which could be installed through the slab structure and incorporated three VP100 automatic bollard systems which control vehicle access to all entrances.
Aesthetic sleeves in stainless steel where fitted providing a holistic style and a finished look to the project.
In order to carry out a successful and satisfactory installation of the project, ATG had specially designed an outer that would not affect the integrity of the slab structure or impinge upon the underground parking.
Once the order was received ATG Access undertook all aspects of the project including the design drawings, provided on-site project management, civil and electrical installation and commissioning of the system.
“We – The Arabian Construction Engineering Company (ACEC) collected the tender for the supply and installation of heavy duty barriers for the college of North Atlantic Qatar. We requested a quotation from ATG Access for the manufacture and supply of the most suitable security products for this project. ACEC subsequently secured the project in May 2008 after a successful technical meeting with the client involving ourselves and ATG Access.”
Mr Shousha, Arabian Construction Engineering Company
Associated products
VP Traffic Automatic Traffic Management Bollard
VP HD Automatic Traffic Management Bollard
SP1000 Shallow Mount Bollard 112mm
Are you looking for a product?
We pride ourselves on providing a large range of products from basic demarcation to rigorously tested high-security solutions. The filter below will help you to find your perfect solution.
Do you need advice?
Get in touch with our specialists to find out how ATG can help you.